Storage Energy Equipments Production Line
- 1 1. High Precision and Harsh Environmental Requirements Cell production requires a clean workshop. The coating accuracy of the electrode sheet needs to reach ±1 μm. Aging Test Phase: Requires simulation of extreme temperatures (-30°C to 60°C) and charge-discharge cycles (thousands of times).
- 2 2. Flexible and Modular Design Supports co-production of multiple types of cells (such as switching between square, cylindrical, and pouch batteries). The modular PACK line can quickly adapt to different capacity requirements for household energy storage, grid-level energy storage, etc.
- 1 3. Green Manufacturing throughout the Entire Process Recycling of waste materials (such as the recovery rate of electrolyte solvent exceeds 90%). Solar roof + energy storage system supplies power to the factory
- 2 1. Breakthrough in Production Efficiency High-speed lamination technology (0.125 seconds per sheet) vs traditional winding process. Integrated integration technology (such as the volume utilization rate of BYD's "blade battery" increasing by 50%).
- 1 2. Rapid Response to Market Demand Modular design supports short-cycle expansion production (such as building a 10GWh production line in 6 months).Software-configurable BMS parameters, adaptable to different application scenarios (domestic/industrial/commercial power generation).
- 2 3. Policy and Industry Chain Synergy Advantages Subsidy policies of various countries (such as the $45/kWh subsidy provided by the US IRA Act). Collaboration with photovoltaic and electric vehicle industries (such as SunPower's integrated solution for power storage).
Comparison of typical photovoltaic
|
type |
core technology |
production capacity |
applicable scenarios |
|
Household photovoltaic storage integrated machine |
modular pre-installation, manual re-inspection |
5000 units/month |
for residential and small commercial use. |
|
Industrial and commercial energy storage system |
containerized PACK, automatic hoisting |
100MWh/month |
suitable for factories and microgrids. |
|
Large-scale energy storage power station |
customized liquid cooling system, tower crane installation |
1GWh/year |
new energy power station |
Case studies
Tesla Solar Roof + Power wall production line: Photovoltaic tiles and energy storage batteries are produced on the same line, reducing installation time by 70%. CATL's photovoltaic and energy storage super factory: Integrates 280Ah energy storage cells with photovoltaic inverters, with an annual capacity of 5GWh per line.

