Column-Mounted Electric Jib Crane, 360° Rotation Cantilever Crane, Heavy-Duty Workshop Lifting Equipment

This column-mounted electric jib crane is engineered for modern industrial workshops, production lines and assembly lines, serving as a core solution for short-distance and precise lifting of heavy materials. Featuring a compact structure and small footprint, it maximizes the use of vertical space in workshops, making it ideal for precision operations such as electrical cabinet assembly and large component relocation.
  • Efficient Lifting Equipped with a standard electric hoist lifting system, it ensures stable and adjustable lifting speed. Combined with the 360° full-rotation jib design, it offers a wide working coverage and significantly improves material handling efficiency.
  • Robust Stability The main column is made of thickened steel profiles with integral welding, and the base adopts a large flange design, which is firmly connected to the ground through anchor bolts to ensure structural rigidity and stability during full-load lifting.
  • Safe and Reliable It is equipped with comprehensive safety protection devices, including upper/lower limit switches, overload protection and emergency stop switches, effectively preventing operational risks and safeguarding personnel and equipment.
  • Flexible Customization Jib length, lifting height and rated load capacity can be customized according to the customer's workshop layout and working conditions, adapting to material lifting tasks of different tonnages.
  • Type Column-Mounted Electric Jib Crane (360° Rotation)
  • Rated Load 0.5T / 1T / 2T / 3T / 5T(可定制 Customizable)
  • Lifting Height 3m - 10m(可定制 Customizable)
  • Rotation Angle 360° Full Rotation / 180° Half Rotation (Optional))
  • Lifting Mechanism Electric Hoist
  • Motor Power 0.75KW - 7.5KW
  • Application Industrial Workshops, Production Lines, Assembly Lines, Warehouses, etc.
Ring Main Unit Assembly Production Line (4)
Ring Main Unit Assembly Production Line (5)
Ring Main Unit Assembly Production Line (6)

DISCRIPTION

Material supply system

- Intelligent warehousing: use stereoscopic warehouse or automated shelving cabinets to store core components such as cabinet bodies, switches, and insulators

- Logistics distribution: AGV(Automated Guided Vehicles) or suspended chain conveyance systems ensure precise material delivery

- Intelligent picking: utilizes RFID or visual recognition technology to automatically match materials with production orders

Cabinet Pre-treatment Section

• Sheet Metal Processing: Laser cutting/bending center completes precise cabinet shaping

• Surface Treatment: Automated spray line achieves corrosion protection (such as epoxy powder spraying)

• Leak Detection: Helium mass spectrometer leak detector performs micro-leak detection on pressurized cabinets (accuracy up to 10^-6 mbar·L/s)

Core assembly module

- Switchgear module: The robotic arm automatically assembles vacuum interrupters, with a torque control system ensuring bolt tightening precision (±3%).

- Busbar system: CNC busbar processing machines achieve ±0.1mm bending accuracy and automatically wrap insulating materials.

- Secondary system: Automated crimping equipment completes the assembly of control wiring harnesses, and the test bench immediately detects circuit impedance.

Testing and verification system

- Mechanical characteristic testing: High-speed cameras record the opening and closing process of switches (time resolution 0.1 ms)

- Electrical tests: 200 kV power frequency withstand voltage equipment + Ultra-high frequency partial discharge detection (sensitivity 1 pC)

- System integration testing: Automatic injection of fault current to verify the accuracy of protective actions

THE FEATURES

Ring Main Unit Assembly Production Line (7)
Ring Main Unit Assembly Production Line (8)
Ring Main Unit Assembly Production Line (9)

Hybrid production model

• Utilizes a layout of 'automation islands + manual workstations', with key processes such as busbar processing fully automated (cycle time 0.8 minutes per piece), while complex assembly retains points for manual intervention

Digital twin applications:

• Optimize assembly processes through 3D simulation (such as virtual validation of mechanical linkages and fitment), ensuring actual assembly errors are controlled within ±0.05mm.

Special environmental control

• Establish a Class 10,000 clean room for insulator assembly, with temperature and humidity controlled at 23±2°C/45±5% RH. The SF6 handling area is equipped with a negative pressure exhaust system, achieving a gas recovery rate of over 99.9%

Full-process quality traceability

Each cabinet generates a unique DNA code, recording over 200 production data points (including bolt torque curves, vacuum level change curves, etc.).

APPLICATION SCENARIOS

Ring Main Unit Assembly Production Line (10)
01

Urban Power Grid System

1. Distribution Substation/ Switching Station

- Acts as a node device for 10kV-40.5kV distribution networks, facilitating power distribution and fault isolation

- Typical application: Smart ring network cabinets in urban underground conduits (integrated DTU for 'three remote' functions)

- Technical specifications: Protection level IP67, short-circuit breaking capacity of 25kA

2. Cable Branch Box Upgrade

- Replaces traditional cable branch boxes, featuring automatic fault location capabilities

- Case study: Singapore's 'Smart Grid' project uses fully insulated RMUs, reducing fault recovery time by 80%

Ring Main Unit Assembly Production Line (11)
02

New Energy Power Generation Field

1. Photovoltaic/Wind Power Collection System

● 35kV ring main units used to collect inverter output current

● Special requirements: salt mist corrosion resistance (C5 level), ability to operate at -40°C low temperatures

2. Energy Storage Power Station

● Ring main protection system between battery clusters

● Innovative application: Huawei's intelligent energy storage solution uses RMU equipped with 5G communication modules

06

Special Application Scenarios

1. Offshore Platforms

● Corrosion resistance up to ISO 12944 C5-M, suitable for environments with 95% humidity

● The Bohai Oilfield project uses stainless steel casing RMU

2. Polar Research Stations

● Operates in extreme cold of -60°C (special lubricants and heating devices)

● Customized solution for China's Great Wall Station in Antarctica

sendinquiry